During heavy rainfall events, stormwater runoff can overflow the existing drainage systems which can lead to flooding. To mitigate this risk, the owner of the project required a solution that temporarily stores large volumes of stormwater, while also regulating the discharge into drainage system.
Hynds provided a 2100mm diameter concrete holding tank. This tank was selected due to its ability to handle large volumes of water while offering durability, longevity, and structural integrity.
The tank plays a vital role temporarily storing stormwater runoff, ensuring that the water is properly managed during peak rainfall periods. Hynds concrete holding tank regulates water discharge, reducing the risk of overloading the stormwater infrastructure and ensuring a more sustainable stormwater management solution.
The installation went smoothly and was completed in 6 hours. Throughout the installation, we provided the necessary support to ensure that the process was efficient. The successful installation of the tank is a testament to Hynd’s commitment to quality and customer satisfaction.
The 2100mm diameter concrete holding tank now is essential for the stormwater management system by preventing flooding and managing the water discharge. The tank now contributes to the facility’s long-term sustainability and resilience during the heavy rain events.