In a first of its kind, the Hillsborough Pump Station project saw the development of tailored solutions to meet the customer’s needs.

The project involved twin lines of 2550 plastic line piped with one line pre-benched and the end caps of the retention tank were also PE lined for full protection. This required collaboration between the Manufacturing, Sales and Engineering departments to develop bespoke precast options to help the customer reduce the effort on site and create the design to offer greater service life and increased load serviceability.