Another case of great collaboration within the Hynds Group of companies, involving Waters & Farr, Hygrade Water, and Hynds Pipe Systems’ Central Region Contracts Team.
Waters & Farr’s 560mm SDR13.6 PE was supplied to the trunk main that will eventually feed the new Peacocke suburb of Hamilton (from the new Ohaupo Rd / Peacocke roundabout off SH3.) The contractor responsible for the installation was valued customer Schick Civil. A representative from Georg Fischer provided training and the correct use of clamping tools whilst installing two GF 560mn OD EF Pipe Saddles (1 x 100mm to end up as a Hydrant set up & 1 x 250mn take off ).
This solution to meet Schick’s requirements, was developed by Josh Farrant from Hygrade and Account Manager Ray Brindle. No matter what the situation we are here to assist our customers get the best results possible.